Skip to content

Service

Servers & Datacenter Solutions

Dell and HPE server deployment, storage architecture, and datacenter build-outs — sized for your workload and your growth, with the power and cooling math done.

The problem

Server rooms tend to be designed once and then grown into until something breaks — usually power, cooling, or a RAID array nobody was monitoring.

The expensive mistakes are made at purchase. Undersize the memory and you're buying again in eighteen months; oversize the whole cluster and you've spent capital on idle capacity.

What's included

  • Server sizing and specification (Dell PowerEdge, HPE ProLiant)
  • Storage architecture — SAN, NAS, direct-attached, and hyperconverged
  • Rack, power, cooling, and cable management design
  • UPS sizing and generator integration
  • Out-of-band management (iDRAC, iLO) so you aren't driving to reboot
  • Backup infrastructure with restore testing, not just backup jobs
  • Hardware lifecycle planning and warranty management
  • Colocation evaluation and migration

How we work

Assess, design, implement, support

  1. 01

    Assess

    We document what you actually have — not what the last as-built says you have.

  2. 02

    Design

    A written design with the reasoning behind each decision, priced before work starts.

  3. 03

    Implement

    Phased cutovers with rollback plans. No single high-risk night.

  4. 04

    Support

    Documentation, knowledge transfer, and ongoing support at whatever level you need.

Servers & Datacenter: common questions

Should we buy servers or move to the cloud?

Steady, predictable workloads are frequently cheaper on-premises over a five-year horizon; variable or bursty workloads favor cloud. Wyoming bandwidth costs and reliability also weigh into it. We build a five-year total cost comparison for your actual workload rather than arguing the general case.

How long do business servers last?

Plan on five years of production life, with warranty coverage for that full period. Many run longer, but past year five you're accepting rising failure rates and shrinking parts availability.

Can you help with a datacenter or server room move?

Yes. Physical moves are largely a planning exercise — dependency mapping, cutover sequencing, and rollback planning. We run the plan and the move.

Let's look at what you're running

A no-cost assessment of your network, servers, or phone system — you get the findings and the recommendations whether or not you hire us.